DATA CENTER FOR INTERXION
DATA CENTER FOR INTERXION
DATA CENTER FOR INTERXION - Madrid
INTERXION
Sector
Technological. Datacenters
Bovis services
Construction Management
Construction cost
€ 31 M
Finish date
2020
PROJECT DESCRIPTION
The building has been designed by the architecture and engineering practice Quark to house cloud infrastructure projects, with high energy requirements and in accordance with the latest standards for energy efficiency, security and high availability.

The new building located in the eastern area of ​​Madrid, with a total built area is 10,000 m2 with 3 IT rooms of 2,600 m2 and an IT room of 2,600 m2 executed in various phases and 5.8MW (2.28Kw / m2) of IT power.

The project is distributed as follows:
  • The basement floor is used for parking, in addition to technical areas and storage.
  • The ground floor includes the reception area, the loading bay and a 300m2 computer room.
  • First floor, 900m2 computer room plus office space.
  • The second floor includes a 1.25m2 computer room plus technical rooms.
  • The HVAC production plant (4u), the generator (3u) and the main panels are located on the deck.