PROJECT DESCRIPTION
The building is structured on the basis of two large parallel linear axes of circulation, the atrium and the central service axis, from which the different care and non-care areas forming the hospital are distributed at both sides, facilitating the segregation of the circulation of patients, professionals and supplies.

The project was developed under a PFI / Concession contract, and Bovis performed the Project Management ser4vices on behalf of the Government, monitoring the concessionaire during the design, construction and commissioning and hand over phases.

The main data of the project are:
  • Plot area: 302,076 m2.
  • Constructed area: 246,964 m2.
  • Built Heights: Low + 7 levels.
  • Number of hospital Beds: 890 approx.